Wed12192018

Last update06:09:01 AM GMT

Research methods for determining the amount of water can be allocated for objects using water in water resource planning

In Vietnam, research, management and sustainable use of water resources beginner made in recent years by the planning related subjects such as irrigation planning, zoning, flood control, planned hydropower, water supply planning ... .For the work allocation of water resources in water resources planning proposal generally been a priority of the principles and priorities for the sector of water supply water used mainly: activities, Industry, Agriculture and Environment and water supply coverage given to the water sector. However the plans that are no basis for determining the amount of water can be allocated before being allocated to the water sector.

Currently, the Center of Planning and Survey National Water Resources is implementing the project and resource planning Bang Giang river basin countries - the United Together of 2 Lang Son and Cao Bang, making methods can determine the amount of water allocated for domestic use objects is needed to implement the project. At 2 Lang Son and Cao Bang, the Centre has carried out and completed the project planning of water resources in 2 provinces; calculating the components related to the determination of the allocation of water can also be calculated but not of flood control and water quality to ensure the essential needs of man is not being considered and addressed.

SP5

From this fact, the theme: " Research methods for determining the amount of water can be allocated to the subjects of water use in water resource planning ." Proposed. The results obtained from this study will e preferred method of determining the amount of surface water can be allocated before the allocation for those using water in water resource planning. And applying x evil to surface water can be allocated before the allocation for objects used on Bang Giang river basins - the United Together .