Sun11182018

Last update01:38:33 AM GMT

Management over test results of the project "Investigation and search for underground water resources in high mountainous regions, water scarcity areas"

toan_cnhPanorama ConferenceOn 12.09.2016, Center of Planning and Survey National Water Resources held management-level acceptance of the results of the project "Investigation and search for underground water sources in the region high mountain regions of water scarcity "by the Federation planning and water resource investigations South, Federation planning and investigation of water resources in Central and technical Center and water resource Consultants done.

Attending were Mr. Tong acceptance Ngoc Thanh - General Director, Centre for Water Resources Planning and Training QG; Vu Van Son - Head of Planning - Finance; Vu Thanh Tam - Head of the Science, Technology and International Cooperation; Mr. Bach Ngoc Quang - Chairman baseline survey of groundwater resources; the leaders and cadres of the units attached to the Centre.

Federation planning and water resource investigations conducted Southern Investigations assessment of groundwater resources in the study area of 3 4 Soc Trang, Bac Lieu and Ca Mau; finished volume 196.19 km 2 , and detailed survey to identify, detect potential areas of groundwater supply in the survey area. Since then, the Federation has been arranged and 5 boreholes drilled search for water flow from 8.76 to 15,32l / s; water sampling analysis types: comprehensive, professional iron, trace, contamination, microbiological at VCCM4 boreholes, VCBL16, VCBL10, VCST10, VCST11 all trace indicators and multiple micronutrients are in allowable limit.

In Gia Lai, Dak Lak, Federation of planning and investigation of water resources in Central made the investigation assessment of groundwater resources in the study area of 2 5 provinces, completed volume 39, 7 km 2 . Since then, the Federation has examined in detail to identify, detect potential areas of groundwater supply, layout drill 12 boreholes search for water flow from 1.0 to 7, 8l / s, simultaneous analysis of water samples to assess groundwater quality QCVN 09-MT / 2015 / BTNMT. According to the analysis results a few samples exceeded the allowed limit: microbiological (total coliforms, E. Coli), nitrogen (nitrite, nitrate, ammonium); all indicators of trace and other macro within permissible limits.

Center for Engineering and Consulting has been investigating water resources, the survey on the area of 10.5 km 2 , including 69 of the survey, the average density of 6.5 / km 2 . Total water resources survey accounted for 79.71% of the total survey. With an area of investigation as per unit made drilling 2 wells with a flow of 1.5 - 2l / s.

Overall, the entire range of the work of the construction company in 2016 were quality, goals and tasks; 100% complete implementation of the planned volume delivered.

Some pictures of the acceptance:

o_Ton1Nguyen Ton reporting project results of QH & DTTNN League Central

Long1Center for Engineering and Consulting TNN reported results of project implementation
toan_cnhPanorama Conference